Message:Alpha Depot: Command Center dated for activation in the year 2021, provided a Hostile Alert code is not sent by team Delta. Use the Antenna Array before 2021 to delay mission start in three-month increments.
Beta Depot: Team of Agronomists dated for activation in 2023. Provided the Idle Pause code is not transmitted by Command before that date. Farming seeds and livestock preserved as frozen embryos. Equipped to establish large scale hydroponics greenhouse farming.
Gamma Depot: Social Liaison Force dated only to be activated by Command code. The team was trained to interact w/ aboriginals, recruit survivors of the blast to stave societal collapse. Leader of the SLF, Murphy, is under suspicion of having extremist, counterculture beliefs. Caution is advised. Permission to terminate granted in the absence of Command countermand. “Let sleeping dogs lie.”
Delta Depot: Scout Team (players) dated for activation in the year 2020. Map the damage to the region, assess toxicity and background radiation, build field report and transmit to Command. Delay Command activation only in the event of analysis delays. Err on the side of activating; we’re all the same Project Team.
Epsilon Depot: Cryonaut casualty replacement personnel for any field team. Activation scheduled for 2018, or anytime in an emergency by code sent from Scout Team or Command. A surface police force equipped w/ unmanned aerial vehicles for extended Scout Team outside the State of Nevada. The hope is create a solid surface base, and these kids will be the fresh set of eyes and enthusiasm for the next stage.
Zeta Depot: Engineering Unit dated for activation in 2022. Provided the Idle Pause code is not transmitted by Command before that date. Tasked w/ building surface base, hydroponics and maintaining-restoring power from Hoover dam.
Yours,
IronRed
18-Feb-2021